Zero Air Generator Running Status

The aadco inst. Zero Air Generator was offline due to repair/maintenance.

  • Summer 2018. Approximate dates 4/25/2018-6/27/2018.
  • 2/13/2019-2/14/2019
  • 4/18/2019-4/26/2019
  • 4/30/2019-5/1/2019
  • 5/7/2019-5/8/2019

Feb 06 2015

LEO-E irrigation valve manifold rebuild

02/03/2015 - East bay irrigation valve manifold removed by Tim to perform complete rebuild (07:30).

Feb 02 2015

LEO-E Camera track system installation

02/02/2015 - Installation of camera track system begins in East bay. First section in position for assembly after approximately 3 hours.