Irrigation

Last modified by Michael Sibayan on 2015/02/13 12:44
Comments (0) · Attachments (0) · History

Category: Irrigation (15 posts) [RSS]

Sep 06 2018

Irrigation and seepage flowrate changed to incremental

The volume calculations for the irrigation (EX81) and seepage (Novalynx,PE102) have been update to show the change in volume between each logging time period (15 minutes) instead of cumulative volume.

Data from 9/6/2018 1:45pm onward reflect these changes.

Expect some data interruption on 9/5/2018 and 9/6/2018.

**Fixed irrigation incremental logging on 9/11/2018 11:00am. Please disregard data recorded from 9/11/2018 8am to 11am.

***EX81 incremental liters/sec can also be found on the Labview DSM.

Nov 07 2016

Irrigation valve actuator swap 2016117093157

On Nov. 6, 2016 from about 10:45 PM - 11:30 PM Aaron and Michael performed work on the electric actuators controlling/monitoring LEO irrigation. 

Several of the actuators were not responding (No diagnostics have been performed), so we swapped around actuators such that each bay now should have a functional actuator on both the MULTI1 and MULTI2 circuit. 

Due to this change several irrigation circuits will display as "in transition" because they have been physically removed / electrically disconnected.

May 09 2015

Irrigation on LEO-C on 2015-05-09

On LEO-C, Multi-1 valve opened at 3:15pm and closed at 4:15pm.

May 01 2015

Irrigation on LEO-W and LEO-C on 2015-04-29

On LEO-C and LEO-W valves for circuits Multi-1 and MP3000 were opened at 10:00 am.

On LEO-C, valves for Multi-1 and MP3000 were closed at 3:07 pm.

On LEO-W, valves for Multi-1 and MP3000 were closed at 3:00 pm.

Feb 13 2015

81 mm irrigation on LEO-W and LEO-C on 2015-02-12

02/12/2015 - 81 mm Irrigation event
Multi1 circuit on both Center bay and West bay opened for approximately 7 hours 10 minutes.
Start time 09:07
End time 16:18.

Feb 06 2015

LEO-E irrigation valve manifold rebuild

02/03/2015 - East bay irrigation valve manifold removed by Tim to perform complete rebuild (07:30).

Feb 03 2015

LEO-C_0_0_0_EX81 registering phantom flow

02/03/2015 - Since the rain event, the Center bay EX81 appears to be continuing to generate data (without flow). Investigation of this anomaly to proceed... 

Jan 30 2015

81 mm irrigation in LEO-W and LEO-C on 2015-01-30

01/30/2015 - 81 mm Irrigation event
Multi1 circuit on both Center bay and West bay opened for approximately 7 hours 15 minutes.
Start time 09:13
End time 16:27.

Feb 19 2013

LEO-E steady state experiment 1

At approximately 10:00 MST on February 18, 2013, irrigation circuit Multi2 was activated to initiate the steady state rain experiment.
At approximately 7:45 MST on February 19, 2013, irrigation was stopped.

Jan 25 2013

LEO-E wetting on 2013-01-25

Jan. 25, 2013 From 10:50 to 17:50 (MST) irrigation circuit Multi2 (E) was run.
Recorded flow rate was approximately 1.13 liters per second - 7100 liters total

Tags:
Created by Michael Sibayan on 2015/02/13 12:44

This wiki is licensed under a Creative Commons 2.0 license
XWiki Enterprise 6.0.1 - Documentation